CIDB
convince@cidb.gov.my 03-4047 7000 (General) / 1-300-88-2432 (Careline)
Register
en-USms-MY
CONVINCE
CONVINCE
Select the search type
  • Site
  • Web
Search
  • Home
  • About Us
    • What is CONVINCE?
    • Contact Us
    • Feedback
    • FAQs
  • Statistics
    • Construction Projects
      • Domestic Projects
      • International Projects
    • Contractors
    • Consultants
      • Engineer
        • Sole Proprietorship
        • Body Corporate
        • Multi Disciplinary
        • Partnership
      • Architect
      • Quantity Surveyor
    • Construction Personnel
    • Ratings, Standard and Tools
      • QLASSIC
      • SHASSIC
      • IBS
      • MyCESMM
      • MyCREST
      • SCORE
      • MCORE
    • Construction Cost & Prices
      • Building Material & Prices
      • Labour Wages Rates
      • Machinery Hire Rates
      • Equipment Purchase Price
      • Cost Index
    • Certification of Construction Product & Material
    • Trade Agreement
    • Projection of Construction Demand
    • Construction Economic Reports
    • Upcoming Construction Projects
  • MyCESMM
    • Courses
    • Projects Registration
  • Publication
    • Category Viewer
    • Cart
    • Wishlist
  • Data Request
  • GIS
Login

CIDB Sarawak uses IBS, local culture for its convention centre

 

CCCKUCHING: A new center piece is in town now with the opening of the swanky CIDB Convention Centre Sarawak (CCCS) on Friday morning  (April 27). The building was launched by Minister of Works Dato’ Sri Fadillah Yusof.

 

The CCCS is the first phase of the CIDB Sarawak Complex built at a cost of RM30 million. It is also the second of CIDB’s convention centres after the CIDB Convention Centre in Jalan Cheras, Kuala Lumpur.

 

The first phase of CIDB Sarawak Complex includes the CCCS, hostel as well as sports and recreation facilities.

 

It is part of the industry’s strategy to elevate the state’s workforce quality through technical education and vocational training (TVET) for Sarawak youths. This is also in line with the government’s goal in promoting and facilitating the construction industry’s transformation in the state.

 

The CCCS can accommodate up to 800 people, and was built with Industrialised Building System (IBS), a modern construction method whereby building components are manufactured in a controlled environment, then installed into construction works.

 

In fact, the CCCS, which is located within the 60-acre CIDB Sarawak complex achieved an IBS score of 78.00 whereas the hostel block that is also located in the complex scored a high 82.69, hence the total development recorded an overall 79.43 IBS score.

 

The CIDB complex was built in an ecologically sustainable method with IBS, integrating the surrounding pond for a cooling effect on the building.

 

A modern, open-wall concept and capillary effect design harnesses natural lighting and wind through its corridors and intermediate spaces.

 

Furthermore, the design of the CCCS drew inspiration from Sarawak, including elements from local Bidayuh and Iban cultures.

 

The hostel block was complete with facilities such as dining hall and kitchen, prayer room, meeting rooms and utility rooms; as well as a grandstand and multi-sports complex.

 

Earlier, during the launch, minister Fadillah reiterated the government’s commitment to improve the industry’s overall productivity.

 

“In this regard, the Ministry of Works through CIDB will continue to invest in upskilling the construction talent pool to create a robust and sustainable construction workforce.

 

Meanwhile, Tan Sri Dr Ir Ahmad Tajuddin Ali, Chairman of CIDB, said the CCCS was a testimony of the government’s efforts as it will serve as the primary institution and training centre for ABM, making it a prestigious and world-class training provider.

 

“This will in turn encourage more locals to join the construction sector, especially as skilled workers,” said Tan Sri Dr Ir Ahmad Tajuddin Ali.

 

[27 April 2018]

QUICK LINKS

CIMS
QLASSIC
SHASSIC
IBS
MYCREST
CCPM
MYN3C

Welcome to CONVINCE!

Login Cancel
  • Register
  • Forgot Password?

| Privacy Policy | Terms of Service |
CIDB MALAYSIA © Copyright 2017 - All Rights Reserved

Best viewed using Mozilla FireFox, Google Chrome and Internet Explorer 9.0+ with resolution 1366x768 or higher.


Last Update:
Visitor's Number: 5ZX7-RTNN-SGMC-COZ4The license provided in the module settings does not match. Please check if the license key is correct.
Level 10, Menara Dato' Onn
Putra World Trade Centre, No 45, Jalan Tun Ismail
50480 Kuala Lumpur

Tel: 03-40477000 Fax: 03-40477070
Email: convince@cidb.gov.my